ETAP project for heterotrophic biological denitrification for water captured from Calaf wells
Drafting of a construction project for a Drinking Water Treatment Plant (ETAP) of heterotrophic biological denitrification for water collected from the wells of Calaf (Anoia), for compliance with RD140 / 2003. The ETAP will have a treatment capacity of up to 400m3 / day and 120mg / l of NO3 and will be used to complete the water purchased for registration at the Aigua Ter-Llobregat (ATL) supply body.