The Goya of Comarruga (El Vendrell) Wastewater Pumping Station had operating problems due to the lack of regulation volume, the poor condition of the pumps and the difficulties of access to the various elements.
To renovate the pumping station, the drafted project contemplated an increase in the storage volume, the replacement of the pumps, the electrical installation and the adaptation of the affected spaces.