The project to adapt the WWTP of the Tossa de Montbui restaurant aimed to solve the deficiencies of the current purification system, conditioning the facilities to current regulations. The action includes the installation of a roughing grate, a grease separator and a filter bed, to expand a purification system that currently only has a septic tank and percolating filter.